The second house we are working on has lots of stuff to be done: a bedroom to be painted, 2 sliding doors to be installed, "stuff" moved around in the living area to make room for the electrical inspector tomorrow morning, insulation and dry wall to be installed, etc. On this team is our leader Fred, and then Guy, Rich, Frank, Barb, Pastor Denise, Melinda, Linda, Rexie and Debbie.Monday, March 22, 2010
Lunch at the Gretna House
The second house we are working on has lots of stuff to be done: a bedroom to be painted, 2 sliding doors to be installed, "stuff" moved around in the living area to make room for the electrical inspector tomorrow morning, insulation and dry wall to be installed, etc. On this team is our leader Fred, and then Guy, Rich, Frank, Barb, Pastor Denise, Melinda, Linda, Rexie and Debbie.